OEM/ODM Service Process

From concept to delivery - our proven 16-step manufacturing process

38+ Years of Manufacturing Excellence

OEM/ODM Custom Manufacturing Process

From concept to delivery — a systematic, transparent, and quality-driven approach to bringing your garden tool visions to life. Trusted by GARDENA, FISKARS, BOSCH, and 20+ global brands.

38+
Years Experience
2000+
Product SKUs
35M+
Annual Output
76,000m²
Production Base

OEM Manufacturing Process

For customers who provide complete product design drawings or 3D models. SUNWELL handles the full manufacturing process from design review to mass production.

Design Drawing ReviewStructural DesignPrototype & ValidationMold DesignMold ManufacturingP0 TrialP1 TrialCertificationMass ProductionFinal Inspection
01

Design Drawing Review

Understand customer design intent and assess manufacturability

3-7 business days

Work Content

Drawing Review — Audit of 2D engineering drawings, 3D models (STEP/IGES), BOM, and technical specifications

Dimensional & Tolerance Analysis — Identify critical dimensions, fit tolerances, surface roughness requirements

Material Selection — Determine materials based on function and usage (SK5 high carbon steel, 65Mn, aluminum alloys, engineering plastics)

Process Feasibility Assessment — Evaluate forging, stamping, injection molding, machining feasibility; identify risks

DFM Report — Output Design for Manufacturing report with optimization recommendations

Deliverables:
DFM Review ReportMaterial SpecificationProcess Flow Plan
02

Structural Design

Complete detailed structural design ensuring functionality and manufacturability

7-15 business days

Work Content

Internal Structure Design — Design internal mechanisms, mating features, locking structures, spring mechanisms

Ergonomic Optimization — Optimize handle shape, weight distribution, operating torque for user comfort

Tolerance Design — Design critical fit tolerances to ensure assembly precision and functional stability

FEA Simulation — Finite Element Analysis on critical load-bearing components to verify strength

2D Drawing Output — Complete part drawings and assembly drawings with dimensions, tolerances, surface treatment

Deliverables:
Complete 2D Drawings3D ModelsFEA Analysis Report
03

Prototype Making & Validation

Produce physical prototypes to validate design feasibility and functional performance

10-20 business days

Work Content

Prototype Fabrication — CNC machining, 3D printing, or silicone molding to produce prototype samples

Appearance Verification — Check appearance, color, and surface treatment against design requirements

Assembly Verification — Validate mating relationships, fit precision, and motion smoothness

Functional Testing — Cutting force tests, open/close smoothness, locking reliability testing

Design Corrections — Revise design based on validation results; produce 2nd prototype if needed

Deliverables:
Prototype Samples (2-5 sets)Validation ReportDesign Correction Records
04

Mold Design

Complete detailed design for mass production tooling

15-25 business days

Work Content

Mold Structure Design — Design cavity count, parting line, gating system, cooling system, ejection system

Moldflow Analysis — Optimize gate position, wall thickness, cooling channels for injection parts

Mold Material Selection — Select mold steel (P20, 718H, S136, H13) based on volume and material properties

Mold BOM — Output mold component list and standard parts list

2D/3D Mold Design — Complete mold assembly drawings, part drawings, and 3D models

Deliverables:
Mold Design ReportMoldflow AnalysisMold 2D/3D Files
05

Mold Manufacturing

Complete mold machining, assembly, and mold trials

30-60 business days

Work Content

Mold Part Machining — CNC rough/finish machining, EDM, wire cutting, grinding

Mold Assembly — Assemble mold base, cores, ejection mechanism, cooling system

Mold Trials (T0/T1) — Trial runs to check dimensions, appearance, molding quality

Mold Corrections — Adjust mold based on trial results (polishing, gap adjustment, etc.)

Mold Acceptance — Customer confirms samples; mold reaches production-ready state

Deliverables:
Production MoldT1-T3 SamplesMold Acceptance Report
06

P0 Trial Production

Small-batch trial to validate product design and mold design

7-15 business days

Work Content

Small Batch Trial — Produce 50-200 units simulating mass production conditions

Product Validation — Verify function, performance, reliability against design requirements

Mold Validation — Verify mold stability, molding quality, expected lifespan

Issue Logging — Record dimensional deviations, appearance defects, assembly difficulties

Design Optimization — Optimize product and mold design based on trial results

Deliverables:
P0 Trial SamplesTrial ReportIssue List & Improvement Plan
07

P1 Trial Production

Medium-batch trial to validate production processes and quality control systems

10-20 business days

Work Content

Medium Batch Trial — Produce 500-1000 units, fully simulating mass production workflow

Process Validation — Verify SOP work instructions, process parameters, fixtures suitability

QC Validation — Verify IQC/IPQC/OQC inspection standards, tools, and sampling plans

Capacity Validation — Verify production line takt time, staffing, output meets order demand

Packaging & Shipping Validation — Verify packaging design and transport protection solutions

Deliverables:
P1 Trial SamplesProcess Validation ReportQuality Control PlanCapacity Assessment
08

Third-Party Certification & Testing

Complete all required certifications and testing for target markets

15-45 business days

Work Content

CE Certification — European market access (Machinery Directive, EMC, RoHS)

GS Certification — German safety certification for garden/power tools

UL Certification — North American safety certification (mainly power tools)

REACH/RoHS — Chemical substance compliance testing

Performance Testing — Cutting performance, durability, salt spray, drop testing

Packaging/Transport Testing — ISTA transport testing, drop test, vibration test

Deliverables:
Test ReportsCertification Certificates
09

Mass Production

Produce order quantity with full quality control

30-60 business days

Work Content

Production Scheduling — Arrange production plan and material procurement based on delivery date

Material Preparation — Raw material procurement, outsourced parts, packaging materials

Production Execution — Execute per SOP with full IQC/IPQC/OQC quality control

Process Documentation — Record production data, quality data, exception handling

Finished Goods Warehousing — Inspect and warehouse finished products upon QC pass

Deliverables:
Finished ProductsProduction ReportQuality Report
10

Pre-Shipment Inspection

Customer or third-party inspection to confirm products meet order requirements

3-7 business days

Work Content

Inspection Preparation — Prepare samples, inspection reports, packing lists, invoices

Customer Inspection — On-site inspection by customer or designated third party (SGS, BV, Intertek)

Inspection Scope — Appearance check, functional test, dimension measurement, packaging check, quantity verification

Issue Resolution — Promptly address any issues found and re-inspect if necessary

Shipment Release — Arrange shipment upon inspection approval

Deliverables:
Inspection ReportShipping Notice

Ready to Start Your Custom Manufacturing Project?

With 38+ years of experience and partnerships with GARDENA, FISKARS, BOSCH, and 20+ global brands, SUNWELL Tools is your trusted OEM/ODM manufacturing partner.

Contact Us Today